Join
today
Boliven PRO is more than just patent search
- Build and save lists using the powerful Lists feature
- Analyze and download your search results
- Share patent search results with your clients
Patents »
US20090306942: System and Method(s) of Mine Planning, Design and Processing
Filing Information
Patent Family
40 Claims, 11 Drawings
Abstract
The present invention relates to the field of extracting resource(s) from a particular location. In particular, the present invention relates to the planning, design and processing related to a mine location in a manner based on enhancing the extraction of material considered of value, relative to the effort and/or time in extracting that material. The present application discloses, amongst other things, a method of and apparatus for determining slope constraints, determining a cluster of material, determining characteristics of a selected portion of material, analysing a selected volume of material, propagating clusters, forming clusters, mine design, aggregation of blocks into collections or clusters, splitting of waste and ore in clumps, determining a selected group of blocks to be mined, clump ordering and identifying clusters for pushback design.
- 1.-68. (canceled)
- 69. A method of determining extraction of material from a mine having at least one pit comprising:
(a) receiving into a data processing system a block model to divide the pit into a plurality of blocks based on predetermined mining parameters;
(b) defining, using the data processing system, a plurality of clusters, each comprising a plurality of blocks;
(c) defining, using the data processing system, a plurality of cones, each containing at least one cluster;
(d) defining, using the data processing system, a plurality of clumps by the intersection of cones;
(e) determining, using the data processing system, a secondary clustering of the blocks in the block order extraction schedule, the secondary clustering, clustering blocks according to spatial order and block order extraction schedule ordering;
(f) propagating, using the data processing system, second cones upwardly from each secondary cluster of blocks; and
(g) ordering, using the data processing system, the extraction of material from each second cone to provide an optimal extraction schedule of all blocks in the pit.
- 82. An apparatus for determining extraction of material from a mine having at least one pit comprising:
a processor for;
(a) receiving a block model to divide the pit into a plurality of blocks based on predetermined mining parameters;
a memory for storing computer program code that, upon execution by the processor performs operations comprising:
(b) defining a plurality of clusters, each comprising a plurality of blocks;
(c) defining a plurality of cones, each containing at least one cluster;
(d) defining a plurality of clumps by the intersection of cones;
(e) determining a secondary clustering of the blocks in the block order extraction schedule, the secondary clustering, clustering blocks according to spatial order and block order extraction schedule ordering;
(f) propagating second cones upwardly from each secondary cluster of blocks; and
(g) ordering the extraction of material from each second cone to provide an optimal extraction schedule of all blocks in the pit.
- 95. A computer program for determining extraction of material from a mine having at least one pit comprising:
(a) code for using a block model to divide the pit into a plurality of blocks based on predetermined mining parameters;
(b) code for defining a plurality of clusters, each comprising a plurality of blocks;
(c) code for defining a plurality of cones, each containing at least one cluster;
(d) code for defining a plurality of clumps by the intersection of cones;
(e) code for determining a secondary clustering of the blocks in the block order extraction schedule, the secondary clustering including, clustering blocks according to spatial order and block order extraction schedule ordering;
(f) code for propagating second cones upwardly from each secondary cluster of blocks; and
(g) code for ordering the extraction of material from each second cone to provide an optimal extraction schedule of all blocks in the pit.
References Cited
The current document has no citations.
Patent Family
The current document is not in a family.
Boliven’s Predicted Expiration Date includes in its calculation the number of days of patent term adjustment a U.S. patent is entitled. The Predicted Expiration Date does not, currently, include in its calculation the payment of maintenance fees, the filing of any disclaimer(s), and/or patent term extension, but Boliven is working to include this information in the near future.